人间正道是沧桑
Chinese-built highway opens ahead of schedule in Senegal_我的网站

A | AI摘要
永泰县塔山革命烈士陵园提升改造工程近日竣工。

B |

Senegalese President Bassirou Diomaye Faye (4th R) addresses the opening ceremony of the Mbour-Kaolack highway project in Thiadiaye, Mbour Department, in Senegal's western Thies Region, Aug. 22, 2026. (Xinhua/Qi Qi)The Mbour-Kaolack highway project, built by China Road and Bridge Corporation, opened to traffic on Saturday at a ceremony in Thiadiaye, Mbour Department, in Senegal's western Thies Region.

Senegalese President Bassirou Diomaye Faye (3rd R) unveils a plaque of the Mbour-Kaolack highway project in Thiadiaye, Mbour Department, in Senegal's western Thies Region, Aug. 22, 2026. (Xinhua/Qi Qi)
Senegalese President Bassirou Diomaye Faye attended the ceremony and said the highway reflects the "quality of the relations between Senegal and China." He said the project is "particularly important for facilitating travel" in central Senegal and improving connectivity between the central region and other parts of the country.
"The highway, which was due to be delivered at the end of September, is now open to traffic," Faye said.
The president thanked the Chinese side for its support and expressed his willingness to further deepen bilateral relations and advance cooperation with China.
Stretching 99.2 km, the Mbour-Kaolack highway connects the western coastal city of Mbour with Kaolack in central Senegal.
。项目优化基础设施与服务功能,拓宽步道与广场,增设防护栏杆、防滑设施及烈士事迹石碑,系统性改善了园区环境与纪念氛围。
记者从永泰县退役军人事务局获悉,塔山革命烈士陵园提升改造工程近日全面竣工。园区整体面貌、基础设施、服务功能得到系统性优化升级。 据悉,本次提升改造坚持尊重历史原貌、突出纪念主题、兼顾实用功能的原则,聚焦设施老化、功能短板、环境风貌等突出问题,实施系统化修缮。 改造后,上山步道拓宽至2.5米,步道两旁栽种花木并设置白色栅栏,沿路增设烈士事迹石碑;所有临坡路段加装青石防护栏杆;烈士墓广场三面拓宽翻新,大幅提升场地承载容量;园区所有台阶完成规整处理,并增设防滑设施。(记者 肖远强 通讯员 王滨淋)。
Current article:http://www.xiongpeiduanlouduoennongleng.cyou/list_jdz77/fn1b.ppt
Published on:02:20:56